Contents
1. General Information
3
2. Preinstallation
7
Planning the Installation Site 7
Receiving the Frequency Converter 7
Transportation and Unpacking 7
Lifting 8
Shipping Weights and Dimensions 8
3. Installation
9
Mechanical Installation 9
Tools Needed 9
General Considerations 9
Installation in Enclosures - IP00 / Chassis units 19
Installation on the Wall - IP21 (NEMA 1) and IP54 (NEMA 12) Units 19
Floor Mounting - Pedestal Installation IP21 (NEMA1) and IP54 (NEMA12) 20
Gland/Conduit Entry - IP21 (NEMA 1) and IP54 (NEMA12) 21
IP21 Drip shield installation (D1 and D2 enclosure) 22
Electrical Installation 23
Control Wires 23
Power Connections 25
Mains connection 34
4. Duct Work Cooling Kit for IP00 Units
35
5. Installation on Pedestal - IP 21 / IP 54 Units
43
6. Start-Up Check
47
Connection Examples 47
Electrical Installation Procedures 47
Programming Procedures - VLT 5000 49
Programming Procedures - VLT 6000 HVAC, VLT 8000 AQUA and VLT 4000 49
Motor Start 50
7. Service During Use
51
8. Drawings
53
Index
58
VLT
®
5000/6000/8000
High Power Installation Guide
Contents
MI.90.J2.02 - VLT
®
is a registered Danfoss trademark
1
Vue de la page 0
1 2 3 4 5 6 ... 58 59

Résumé du contenu

Page 1 - Contents

Contents1. General Information32. Preinstallation7Planning the Installation Site 7Receiving the Frequency Converter 7Transportation and Unpacking 7Lif

Page 2 - 1. General Information

Illustration 3.3: Airflow direction and necessary space for coolingLeft: Enclosure IP21/54, D1 and D2.Right: Enclosure IP00, D1, D2 and E1.Illustratio

Page 3

Wire accessEnsure that proper wire access is present including necessary bending space. As the IP00 enclo-sure is open to the bottom wires must be fix

Page 4 - 1.1.5. Use on Isolated Mains

IP 00 / Chassis IP 21 (NEMA 1) / IP 54 (NEMA 12) Enclosure D1 Enclosure D2 Enclosure D1 Enclosure D2A 119 (4.7) 122 (4.8) 277 (10.9) 379 (14.9)B 68

Page 5

Terminal locations - E1 enclosuresTake the following position of the terminals into consideration when designing the cable access.Illustration 3.7: IP

Page 6 - 2. Preinstallation

Illustration 3.9: IP00 enclosure power connections positions of disconnect switchIllustration 3.10: IP21 (NEMA Type 1) and IP54 (NEMA Type 12) enclosu

Page 7

Illustration 3.11: IP21 (NEMA type 1) and IP54 (NEMA type 12) enclosure power connection positions (detailB)Illustration 3.12: IP21 (NEMA type 1) and

Page 8 - 2.1.4. Lifting

Note that the power cables are heavy and difficult to bend. Consider the optimum position of thefrequency converter for ensuring easy installation of

Page 9

Illustration 3.15: Position of earth terminals IP21 (NEMA type 1) and IP54 (NEMA type 12)CoolingCooling can be obtained in different ways, by using th

Page 10 - 3. Installation

Duct coolingA dedicated option has been developed to optimise installation of IP00 / Chassis enclosed fre-quency converters in Rittal TS8 enclosures u

Page 11

Illustration 3.17: Combined use of cooling principlesThe above mentioned solution can of course also be combined for an optimised solution in theactua

Page 12

1. General InformationVLT® 5000/6000/8000High Power Installation Guide2 MI.90.J2.02 - VLT® is a registered Danfoss trademark 1

Page 13

Illustration 3.18: Lifting method for mounting drive on wall3.1.5. Floor Mounting - Pedestal Installation IP21 (NEMA1) and IP54(NEMA12)IP21 (NEMA type

Page 14

The E1 enclosure is always delivered with apedestal as standard. Install the pedestal onthe floor. Fixing holes are to be drilled accord-ing to this f

Page 15

Illustration 3.23: Cable entry seen from the bot-tom of the frequency converter - Enclosure E1.The bottom plate of the E1 enclosure can be mounted fro

Page 16

3.2. Electrical Installation3.2.1. Control WiresConnect the wires as described in the Operat-ing Instruction for the frequency converter.Remember to c

Page 17

A pre-fuse of min. 6 Amp, slow-blow, can be fitted to protect the external 24 V DC supply. Thepower consumption is 15-50 W, depending on the load on t

Page 18

3.2.2. Power ConnectionsCabling and FusingThe power cable connections are situated as shown below. Dimensioning of cable cross sectionmust be done in

Page 19

Illustration 3.29: Compact IP 21 (NEMA 1) and IP 54 (NEMA 12), enclosure D1 with disconnect fuse and RFIfilterIllustration 3.30: Compact IP 00 (Chassi

Page 20 - (NEMA12)

Illustration 3.31: Compact IP 21 (NEMA 1) and IP 54 (NEMA 12) with disconnect, fuse and RFI filter, enclo-sure D2Illustration 3.32: Compact IP 00 (Cha

Page 21

Illustration 3.33: Compact IP 00 (Chassis) with disconnect, fuse and RFI filter, enclosure E1Illustration 3.34: Position of earth terminals IP003. Ins

Page 22

Illustration 3.35: Compact IP 21 (NEMA 1) and IP 54 (NEMA 12) enclosure E1Illustration 3.36: Position of earth terminals IP21 (NEMA type 1) and IP54 (

Page 23 - 3.2. Electrical Installation

1. General Information1.1. Safety and General Information1.1.1. General WarningThe voltage of the frequency converter is dangerous whenever the equipm

Page 24

3.2.3. Earthing The following basic issues need to be considered when installing a frequency converter, so as toobtain electromagnetic compatibility (

Page 25 - 3.2.2. Power Connections

The RFI switch connects the capacitors galvanically to earth.1) Not required with 525-600/690 V drives; therefore not possible.3.2.6. Torque When tigh

Page 26

The factory setting is for clockwise rotation with the VLT frequency converter output connectedas follows:Terminal No.Function96, 97, 98,99Mains U/T1,

Page 27

If the temperature of the brake resistor gets too high and the thermal switch dropsout, the frequency converter will stop braking. The motor will star

Page 28

Illustration 3.39: Mounting of EMC shield.3.2.13. Mains connection Mains must be connected to terminals 91, 92 and 93. Earth/ground is connected to th

Page 29

4. Duct Work Cooling Kit for IP00 UnitsThis chapter deals with the installation of IP00 / chassis enclosed frequency converters with ductwork cooling

Page 30 - 3.2.3. Earthing

This illustration shows the full size templateincluded with the kit and two drawings thatmay be used to locate the cutouts for the en-closure top and

Page 31 - 3.2.8. Motor cable

Illustration 4.5: Bottom duct adapter installedIllustration 4.6: Side viewNB!Install the bottom plate after the frequency converter has been installed

Page 32 - 3.2.9. Brake Cable

Illustration 4.8: Frequency converter installed incabinetThe top ductwork cover is composed of thefollowing pieces as shown below. From left toright:

Page 33 - 3.2.11. Load Sharing

Illustration 4.13: Gasket folds over the edge toform seal between the duct and top vented coverIllustration 4.14: Top duct installedIllustration 4.15:

Page 34 - 3.2.14. External Fan Supply

1.1.3. Warning Against Unintended Start1. The motor can be brought to a stop by means of digital commands, bus commands,references or a local stop, wh

Page 35

Illustration 4.20: Top duct closing plate installed Illustration 4.21: Enclosure top installedIllustration 4.22: Top view of Rittal enclosureThe botto

Page 36

Illustration 4.26: Temporarily install duct work tomark cutout on the glandThe cutout is made on the innermost glandplate. The remaining two gland pla

Page 37

Illustration 4.31: Bottom duct installed.4. Duct Work Cooling Kit for IP00 UnitsVLT® 5000/6000/8000High Power Installation Guide42 MI.90.J2.02 - VLT

Page 38

5. Installation on Pedestal - IP 21 / IP 54 UnitsThe frequency converter can also be installed on the floor. A dedicated floor stand is designed forth

Page 39

The kit contains a U-shaped piece, a ventedfront cover, 2-side covers, two front bracketsand the required hardware to assemble Seethe exploded view of

Page 40

Illustration 5.6: Two nuts at rear side.Illustration 5.7: Three front screws.Illustration 5.8: Frame D2 with pedestal installedVLT® 5000/6000/8000High

Page 41

6. Start-Up CheckVLT® 5000/6000/8000High Power Installation Guide46 MI.90.J2.02 - VLT® is a registered Danfoss trademark 6

Page 42

6. Start-Up Check6.1.1. Connection ExamplesFor details see the Operating Instructions of the specific frequency converters.Brake terminals 81 and 82 a

Page 43

1. Check for proper ambient operating conditions. See Derating for ambient temperaturein the relevant Design Guide.2. Check for free flow of cooling

Page 44

Close the doors and connect the power to the VLT frequency converter. The green voltage indi-cator lamp (ON) on the control panel is activated when th

Page 45

Manual ObjectivesThe purpose of this manual is to provide the user with the necessary information to install andperform the basic commissioning of the

Page 46 - 6. Start-Up Check

Set the desired language in parameter 001.Set motor parameters according to the motor plate:Motor power Parameter 102Motor voltage Parameter 103Motor

Page 47

7. Service During UsePreventive maintenanceTo ensure a long and problem-free use of the frequency converter we recommend that you per-form preventive

Page 48

8. DrawingsVLT® 5000/6000/8000High Power Installation Guide52 MI.90.J2.02 - VLT® is a registered Danfoss trademark 8

Page 49

8. Drawings • Mechanical detailed drawingVLT® 5000/6000/8000High Power Installation Guide8. Drawings MI.90.J2.02 - VLT® is a registered Danfoss tradem

Page 50 - 6.1.5. Motor Start

8. DrawingsVLT® 5000/6000/8000High Power Installation Guide54 MI.90.J2.02 - VLT® is a registered Danfoss trademark 8

Page 51 - 7. Service During Use

VLT® 5000/6000/8000High Power Installation Guide8. Drawings MI.90.J2.02 - VLT® is a registered Danfoss trademark 558

Page 52 - 8. Drawings

8. DrawingsVLT® 5000/6000/8000High Power Installation Guide56 MI.90.J2.02 - VLT® is a registered Danfoss trademark 8

Page 53

VLT® 5000/6000/8000High Power Installation Guide8. Drawings MI.90.J2.02 - VLT® is a registered Danfoss trademark 578

Page 54

IndexAAirflow 17BBack Cooling 18Brake Cable 32Brake Resistor Temperature Switch 32CCabling 25Cooling 17DDrip Shield Installation 22Duct Cooling 18Duct

Page 55

SService During Use 51Shielded Cables 31TTerminal Locations 11Torque 31UUnintended Start 4Unpacking 7WWeight And Dimensions 8Wire Access 11VLT® 5000/6

Page 56

2. PreinstallationVLT® 5000/6000/8000High Power Installation Guide6 MI.90.J2.02 - VLT® is a registered Danfoss trademark 2

Page 57

2. Preinstallation 2.1.1. Planning the Installation SiteBefore performing the installation it is important to plan the installation of the frequency c

Page 58

2.1.4. Lifting Always lift the frequency converter in the dedicated lifting eyes. Use a bar to avoid bending thelifting holes of the frequency convert